Essential works to temporarily and then permanently relocate a dry cooler at busy London Bridge Station necessitated some very careful planning, as it required the temporary closure of both bus stands and taxi ranks.

Added to this, the dry cooler was required to be back in service as soon as possible, to maintain continuity of cooling duty to the various essential temperature critical areas of the Underground Station.

A limited time was allowed for us to proceed with these works, which were carried out on a Saturday when a local football derby would see afternoon passenger traffic at the station become very heavy.

Given a deadline of needing to be off-site by 3pm, the use of our careful and experienced preparations allowed us to actually be on our way well before lunchtime!
As the footie fans may have said, “What a result!”